The employer, the location of the project, the reasons for the plan
Employer: Construction and Development Company of Iran’s Transportation Departments (Deputy Director of Freeway Construction and Development)
Location: Markazi Province – Lorestan Province
Way Type: Free Six Way Route
Arak Freeway Project – Khorram Abad is one of the most important traffic corridors in the north of the country, which has long been considered. This free way provides the connection of the northern regions of the country (Bandar Anzali, Astara and Noshahr) to the south and southwest areas, especially the port of Imam Khomeini, which, in addition to its role in moving the load and domestic passenger along the corridor, has a special place in import and Export and transit of goods. With the construction of this free road, the connection between the freeway of Arak – Salafchegan – Saveh and Khorramabad – Zal bridge will be established. On the other hand, in the event of the extension of the freeway from Salafchegan to Qom and connecting it to the Free Shrine to the shrine, there will be significant effects on the dynamics and stability of the freeway network in the country.
Estimated plot, number of bridges, tunnels
Type of design: design and construction
Track width: 35/30 m
Length: 134/200 km
Big bridge: 21 devices
Intersection intersection: 4
12 special bridge devices
341 bridge brigade
The six tunnel spans are 8436 meters long
2013/july/5
9600 billion Rials
Contract number and start date of the project
Start date: 2013/july/5
This project started with a joint venture between the company and the development of transportation infrastructure of the country and the construction site of Khatam-ol-Anbia (PBUH), and the design and construction contract including all the operations related to the design and supply of materials and the construction of the 6th freeway with the construction site of Khatam-ol-Anbia P.), The length of this freeway is 134/200 km and the duration of the 36-month contract is set at a cost of 9600 billion rials starting on 2013/july/5and will end at the end of the term specified in the contract, along with interest In this way, the distance between Arak and Khorramabad will be reduced by about 32 km from existing routes.
project progress
Under construction and implementation of supporting structures
About us
Consulting, design and supervision of road and bridge construction projects and railways
Contacts
Yousef Abad Fathi Shaghaghi Ave. Bisotun Alley 2/1 Plac 49
Tel : 021 – 88992011-3
Fax : 012 – 88955402
info@vinehsaar.com
Office Hours
Saturday to Wednesday: 8am to 4:30 pm
Thursday and Sunday: closed