The employer, the location of the project, the reasons for the plan
Employer: Construction and Development Company of Iran’s Transport Infrastructure (Deputy Director of Freeway Construction and Development)
Location of project: Mazandaran province
Project length: about 45 km
Type of study: Renovation
Since the cities of Ghaemshahr and Sari are located in the area between the main axis of Firouzkooh and the main route of communication to the east of Mazandaran province and Golestan province, considering the state of the existing ways, the volume of cargo and passenger transportation in the region, the construction of freeway Ghaemshahr – Sari will facilitate the transit of vehicles passing through these two cities.
Currently, vehicles that intend to access the cities and ramparts from the cities of Ghaemshahr and Sari, will have to pass through the inner city of Qa’im City and Sari. The passage of high traffic volumes from the city of Qa’em Shahr and Sari, especially since most of these vehicles are heavy, increase traffic, slowness of inland routes, increase accidents, create noise pollution and environmental The loss of travel time in intra-city and interurban trips, the reduction of the level of service within the city’s routes, and the economic loss of large amounts of fuel due to increased travel time and the acceleration of cars, as well as due to continuous stops and increase the route Loss of large amounts of fuel will be lost. In fact, the construction of a route outside the city limits has increased Speed of passage and increase of service level, which will be a factor in attracting out-of-town traffic, and consequently there will be a significant decrease in intra-city traffic and positive effects of daily living in Ghaemshahr and Sari residents. Therefore, the construction and use of Qa’em Shahr and Sari freeway is an indispensable necessity.
Estimated plot, number of bridges, tunnels
Number of bridges
32 special bridges
207 bridge brigade
Number of tunnels
Two spans of 1500 meters in lengthر
start date
Waiting for credit allocation
Estimated price
7421 billion Rials
Contract number and start date of the project
Contract No. 47/51630 – dated 2012/july/4
project progress
Waiting for budget allocation
About us
Consulting, design and supervision of road and bridge construction projects and railways
Contacts
Yousef Abad Fathi Shaghaghi Ave. Bisotun Alley 2/1 Plac 49
Tel : 021 – 88992011-3
Fax : 012 – 88955402
info@vinehsaar.com
Office Hours
Saturday to Wednesday: 8am to 4:30 pm
Thursday and Sunday: closed